Skip to content
Skip to content
Electricians cost guide

House rewire cost: £4,000–£10,000

A whole-house rewire is a major project. The range reflects property size, access and how much making good is needed afterwards.

These are broad UK budgeting allowances for typical quotes, not a fixed quote or a survey of completed jobs. Confirm VAT, access, specification and exclusions with the contractor before booking.

Prices checked: 19 October 2026. Editorial budgeting allowances for typical quotes; not a contractor price survey. Confirm the current total, VAT and exclusions locally.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

Cost by property size

A free website for your trade, built from your Google listing: a page for every job you do and every town you cover, a call button on every page, and every enquiry texted to you, free. No card, no contract, no time limit.

Illustrative whole-house rewire budgets in pounds, including standard fittings, labour, testing and VAT where charged. Plaster repairs, decoration and temporary accommodation are excluded; unusually complex homes can exceed these allowances.
Property / job sizeLowTypical allowanceHigh
1–2 bedroom flat£3,000£4,000£5,500
2 bedroom house£3,500£4,500£6,000
3 bedroom house£4,500£6,000£8,000
4 bedroom house£6,000£8,000£11,000
5+ bedrooms or complex layout£8,000£11,000£15,000+
  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

What is included?

A full rewire usually means replacing the fixed wiring for the agreed domestic circuits, fitting a suitable consumer unit, and installing the sockets, switches and lighting points listed in the specification. The electrician should design the circuits around your actual needs rather than simply copy the old layout. Count every outlet before asking for prices: an extra room, garden supply or home office can change the scope considerably.

A comparable quote should cover cable routes, standard accessories, circuit protection, earthing and bonding work that has been identified, inspection, testing and an Electrical Installation Certificate. Ask who handles any required Building Regulations notification. A new consumer unit alone is not a full rewire, and replacing visible sockets does not tell you whether concealed cables have been replaced.

Budget separately for plastering chases, repairing floors, redecorating, moving heavy furniture and specialist removal of hazardous materials. Some contractors offer basic filling, others leave chases open for your plasterer. Decorative lights, smart controls, data cabling, electric vehicle charging and outbuilding supplies need explicit allowances. Agree who buys fittings, who checks compatibility and what happens if customer-supplied items delay completion.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

What moves the price?

Property size is only a starting point. Circuit count, the number of sockets and the length of cable runs determine more of the actual work. A compact house with several bathrooms, an electric shower and a large kitchen may need more design and installation time than a larger house with a simpler layout. Ask for a room-by-room schedule rather than a price based only on bedrooms.

Access often explains the largest difference between quotes. Empty rooms and lifted floorboards make cable routes easier; tiled floors, concrete construction and recently decorated walls make them harder. Occupied homes need protection, careful sequencing and agreed safe power arrangements. Period features, thick masonry and inaccessible loft spaces may require alternative routes or specialist repairs, which should be discussed before work starts.

Specification matters as much as labour. Standard white sockets cost less than decorative metal accessories, and a few pendant lights require less work than extensive downlighting. Consumer-unit protection must suit the installation and current requirements. Ask the electrician to explain the proposed protective devices and any separately priced options; do not delete safety measures simply to match a cheaper headline price.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

How long does it take?

For initial planning, allow roughly five to ten working days for a straightforward three-bedroom house, with a longer programme for an occupied or complex property. This is a scheduling allowance, not a completion promise. Team size, access, fittings and repairs can all move it. Your electrician should visit before giving a firm programme and explain when each room will be unavailable.

Rewiring commonly has a first fix, when cable routes and boxes are installed, followed by a second fix after the relevant surfaces are ready. Testing and certification come before handover. Plaster drying and decorating sit outside the electrical timetable. Agree isolation times, access to essential appliances and daily clean-up; arrange suitable accommodation if safe occupation cannot be maintained.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

When is it required?

Age alone does not establish that every cable needs replacing. Ask a competent electrician to assess deterioration, damage and whether existing circuits can safely support the planned use. An EICR can inform that decision. Repeated tripping, damaged accessories or signs of overheating need assessment, but the right remedy may be a local repair or a partial rewire rather than replacement throughout.

In England, domestic electrical work must meet Part P of the Building Regulations; a full rewire normally includes notifiable work such as new circuits. Agree the notification route in advance. On completion, retain the Electrical Installation Certificate and the applicable Building Regulations compliance paperwork. Rules and procedures differ across the UK, so confirm the local requirements if your property is outside England.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

Ways to keep the cost down

Plan the rewire alongside a renovation, before new plaster, fitted kitchens and finished flooring make access expensive. Agree the final socket and lighting plan early, then mark positions with the electrician. Changes after cables are installed can cost more than choosing the right layout at the start. Standard accessories in less visible rooms can preserve the budget without compromising the installation.

Clear rooms and arrange access if the contractor confirms that this will reduce labour. Compare the same specification from several suitable electricians and ask for optional extras to be separated. Keep a contingency for genuinely concealed problems rather than spending the entire budget on fittings. Do not chase walls, lift suspect materials or attempt electrical work yourself to reduce the bill.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

How to get a fair quote

Give each electrician the same floor plan, outlet schedule and list of large electrical loads. Explain whether the house will be occupied and identify finishes you want protected. Ask for the total including VAT where applicable, payment stages, expected start and completion dates, waste removal and a clear list of exclusions. A site visit is especially valuable where cable routes are uncertain.

Check that the contractor is competent for domestic rewiring and verify any claimed scheme membership. Get changes approved in writing with their price before they are carried out. At handover, request the test results, certificate, circuit labels and a demonstration of the protective devices. Keep these records with your property documents; they help future maintenance and answer questions when you sell.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Free for UK trades

West Midlands prices and access

A rewire in Birmingham, Coventry, Wolverhampton or the Black Country still depends on the individual house. Victorian terraces may have awkward floor access and older alterations; flats may need permission to work in shared areas. Parking restrictions, loading access and working hours can affect scheduling. Tell the electrician about these constraints before the visit rather than assuming a regional discount will cover them.

Use the UK allowances as a starting budget and obtain local written quotes for your own specification. We do not apply an invented West Midlands percentage adjustment or claim a measured regional average. Compare nearby electricians on scope, access assumptions and certification as well as price, and check that plastering and VAT have been treated consistently across the quotes.

  • Built from your Google listing in about a minute
  • Goes live once we've checked the business is yours
  • Every enquiry texted to you, free
  • Nobody can pay to rank above you
Before you book

House rewire cost questions

Everything trades ask us before they say yes.

How much does a three-bedroom house rewire cost?

A useful planning allowance is £4,500–£8,000, with around £6,000 as an illustrative middle budget for a straightforward specification. This is not a measured average or a fixed offer. Occupation, difficult cable routes and extra fittings can push it higher. Ask for a surveyed quote and add any excluded plastering or decoration before deciding what you can afford.

Can I stay in the house during a rewire?

Sometimes, if the contractor can maintain safe conditions and agree a workable sequence. Expect dust, noise, lifted floors and interruptions to power. Discuss children, pets, home working and medical equipment before booking. Moving out may simplify the job, but the saving in labour needs comparing with the cost and inconvenience of temporary accommodation.

Does a rewire quote include a new consumer unit?

It commonly does, but the written scope should identify the unit, protective devices and circuits. Earthing and bonding upgrades may need a separate allowance if their condition is not yet established. Compare what is included rather than assuming every quote uses the same equipment. A consumer-unit replacement on its own does not replace the existing wiring.

Does old wiring always need replacing?

No. Condition, installation quality and suitability for the intended use matter more than a birthday. Have an electrician inspect and test where appropriate. A report may identify isolated defects, circuits needing further investigation or more extensive deterioration. Ask why a full rewire is recommended and whether a properly designed partial replacement would resolve the findings.

Is plastering included in the rewire price?

Often it is excluded, or limited to rough filling of cable chases. Ask whether the contractor will leave surfaces ready for decoration or only electrically complete. Agree who repairs damaged coving, tiles and floor finishes. A lower electrical quote can become a larger overall project if you have not budgeted for the finishing trades.

Can I rewire one room at a time?

A phased project can be possible, but the electrician needs to design the whole arrangement and assess how new and existing circuits interact. Repeated visits and temporary arrangements may cost more than a single project. Get the sequence, certificates and responsibilities agreed before starting, especially where the consumer unit and shared cable routes also need work.

What certificates should I receive after rewiring?

Request an Electrical Installation Certificate with the relevant schedules, plus the applicable Building Regulations compliance documentation for notifiable work. Keep both with your house records. An EICR assesses an existing installation and is a different document; it does not replace the installation certificate for the new work. Confirm the paperwork in the quote rather than chasing it afterwards.

Will a rewire increase the value of my home?

Do not assume a particular increase or that the project pays for itself. Safe, documented electrics can address concerns raised by buyers, but market value depends on many other factors. Decide on the work using the condition of the installation and your planned use of the house. Keep certificates and invoices so future buyers can understand what was done.

How it works

Find electricians near you

From typing your business name to your first enquiry, here is the route.

How it works

More electricians cost guides

From typing your business name to your first enquiry, here is the route.