Consumer unit replacement cost: £500–£1,200
Replacing a domestic consumer unit often costs several hundred pounds, with testing and remedial work priced separately when needed.
These are broad UK budgeting allowances for typical quotes, not a fixed quote or a survey of completed jobs. Confirm VAT, access, specification and exclusions with the contractor before booking.
Prices checked: 19 October 2026. Editorial budgeting allowances for typical domestic quotes; not an installer price survey. Confirm board specification, testing, VAT and exclusions in writing before booking.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
Cost by property size
A free website for your trade, built from your Google listing: a page for every job you do and every town you cover, a call button on every page, and every enquiry texted to you, free. No card, no contract, no time limit.
| Installation | Low | Typical allowance | High |
|---|---|---|---|
| Small flat, accessible circuits, standard RCBO board | £450 | £600 | £800 |
| Average house, up to around 10 circuits | £550 | £750 | £1,000 |
| Larger house or multiple consumer units | £800 | £1,100 | £1,600+ |
| Board replacement with earthing or bonding upgrades | £700 | £1,000 | £1,500+ |
| Board plus fault investigation or circuit repairs | £800 | £1,300 | £2,000+ |
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
What is included?
A typical replacement quote includes a suitable new consumer unit, protective devices for the existing circuits, removal of the old board, reconnection, inspection and testing of the circuits affected by the work, and an Electrical Installation Certificate. Ask whether the price also includes notification under the Building Regulations and the resulting compliance record. The electrician should label the circuits and explain any limitations or observations found during testing.
The choice of protection changes both the board and the price. A modern unit may use individual RCBOs, which combine overcurrent and residual-current protection for each circuit, or another compliant arrangement selected for the installation. Surge protection may be appropriate or required depending on the circumstances and the applicable wiring rules. Ask for the proposed design and why it suits your home; a more expensive feature is not automatically necessary in every case.
A consumer-unit change is not the same as an Electrical Installation Condition Report for the whole property. The electrician must assess whether existing circuits can safely be connected to the replacement and test the completed work, but a full condition report may be a separate service. Remedial work, replacing damaged cables, adding circuits, repairing faults and making good plaster or decoration are commonly extra. Agree how those items will be priced before work starts.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
What moves the price?
Circuit count and layout affect the board size, materials and time needed to identify and test each circuit. A small flat with electric cooking, heating or a shower can have more circuits than its floor area suggests. Send a clear photo of the existing board and describe extensions, outbuildings and separate supplies, but expect an electrician to confirm the details in person before giving a firm price.
Earthing and bonding can lead to additional work. The electrician checks the earthing arrangement and bonding to services such as gas and water where applicable. If these are absent, undersized or inaccessible, they may need upgrading before the new unit can be commissioned safely. This is a reason for a survey and itemised quote, not a reason to accept an unexplained bundle of extras.
The condition of the existing wiring is a major unknown. Insulation damage, borrowed neutrals, shared conductors, poor connections or earth faults can prevent a circuit from passing tests or cause protective devices to trip. The electrician may need to investigate and repair the fault before reconnection. A replacement board does not repair old wiring, and a test result should be explained rather than hidden in a generic contingency.
Access, location and specification also change the price. A board in a cramped cupboard, an outbuilding, or a location that needs moving takes longer than a clear, accessible installation. More ways, individual RCBO protection, surge protection, fire-resistant mounting or work to multiple boards can add material and labour cost. Ask for the base replacement and optional upgrades to be shown separately.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
How long does it take?
A straightforward replacement commonly takes most of a working day, often around four to eight hours on site. Larger boards, multiple units, awkward access, earthing upgrades or faults can extend the visit or require a return appointment. The electrician should explain what can be completed that day and what would need separate work once the circuits have been tested.
The power will be off for much of the work. Plan for refrigeration, internet equipment, alarms, electric showers and any medical equipment that relies on mains power. Do not open the consumer unit or attempt to move circuits yourself. Clear access to the board and meter, arrange entry to all rooms, and ask when power is expected to be restored before booking the appointment.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
When is it required?
Replacing a consumer unit is notifiable electrical work in England and Wales under Part P of the Building Regulations. Use an electrician registered with a competent person scheme who can notify the work, or agree the building-control route before work begins. Scotland and Northern Ireland have different building standards and notification arrangements, so check the rules that apply to the property. Ask for the Electrical Installation Certificate and the relevant compliance record on completion.
Check that the electrician is competent in inspection and testing as well as installation. Ask to see relevant qualifications, insurance and any scheme registration, and verify the registration with the scheme. The certificate records the work and test results; it is not a guarantee that every part of an older installation has been renewed or assessed as part of a full EICR.
For rented homes in England, landlords must arrange inspection and testing at least every five years, or sooner if the report says so, and complete required remedial work within the applicable deadline. A new consumer unit on its own does not replace that inspection duty. Rules differ across the UK and by tenancy, so check the current official guidance for the property and tenancy.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
Ways to keep the cost down
Get two or three written quotes based on the same scope. Provide clear photos, circuit information if known, and details of any previous inspection findings. Make the area accessible and arrange access to rooms so the electrician can identify circuits without delays. These steps help the electrician price the actual job rather than include a broad allowance for unknowns.
Ask which safety measures are included, what is optional, and what happens if a circuit fails testing. A lower quote may exclude certification, notification, earthing work or the cost of fault finding. Compare the full price including VAT where charged, the board and protective devices specified, and the extra-work rates. Avoid choosing a quote that promises a pass before any inspection has happened.
If an EICR has identified a problem, ask the electrician to distinguish a defect that must be corrected before the board change from an improvement recommendation. You can ask for a second opinion on substantial proposed remedial work, but do not delay action where there is an immediate safety concern. Keep the certificate, test results and invoices with the property records.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
How to get a fair quote
A clear quote states how many consumer units and circuits are included, the proposed unit and protection arrangement, whether surge protection is included, and whether earthing or bonding work is allowed for. It should list testing, circuit labelling, certification and Building Regulations notification, then show VAT, exclusions, payment terms and the price for additional investigation or repairs. Ask how any variation will be approved before extra work is carried out.
The electrician should ask about the existing installation and explain that testing may reveal faults that are outside the replacement price. Be wary of pressure to replace a board solely because it looks old, or of a quote that offers a guaranteed pass without testing. A sound explanation links each proposed upgrade or repair to a test result, safety requirement or clearly stated preference.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
West Midlands prices and access
Across Birmingham, Coventry, Wolverhampton and nearby towns, housing ranges from converted flats and older terraces to newer estates. Existing boards, circuit counts and earthing arrangements vary within the same street, so a postcode alone cannot predict the job cost. Mention shared meter cupboards, parking, tenant access and any extensions or outbuildings when arranging a visit.
The table is a UK budgeting guide rather than a measured West Midlands price survey. Ask local electricians to quote the same board specification and testing scope, and check whether travel, parking or a second visit is included. Compare the written scope and likely extras as well as the headline price.
- checkBuilt from your Google listing in about a minute
- checkGoes live once we've checked the business is yours
- checkEvery enquiry texted to you, free
- checkNobody can pay to rank above you
Consumer unit replacement cost questions
Everything trades ask us before they say yes.
How much does it cost to replace a consumer unit?keyboard_arrow_down
A straightforward domestic replacement commonly budgets at about £500–£1,200 including standard materials, labour and testing, with larger or fault-affected jobs costing more. The table gives illustrative scenarios, not a fixed tariff. Ask for a survey and a written price that says whether certification, notification and VAT are included.
How long does a consumer unit replacement take?keyboard_arrow_down
Allow most of a working day for a straightforward job. Several boards, difficult access, earthing upgrades or faults can make it longer or require a return visit. Expect the power to be off for much of the appointment and agree the likely outage window in advance.
Does replacing a consumer unit mean my house is rewired?keyboard_arrow_down
No. The new unit reconnects existing circuits that are suitable to retain; it does not replace the cables in the walls. Testing may reveal wiring defects that need repair or further investigation. A full rewire is a separate and much larger project.
Will the electrician test the whole house?keyboard_arrow_down
The electrician inspects and tests the circuits as needed for the replacement and certifies the work. A full Electrical Installation Condition Report is a separate assessment unless it is explicitly included in the quote. Confirm the scope and any limitations before booking.
Do I need an EICR before changing the consumer unit?keyboard_arrow_down
Not in every case, but a condition report or a suitable pre-work survey can help identify faults before the change. The electrician still needs to check whether circuits can be safely reconnected and may recommend separate investigation if results require it. Ask what assessment is included.
Is consumer-unit replacement notifiable?keyboard_arrow_down
In England and Wales it is notifiable under Part P of the Building Regulations. A registered electrician can usually certify and notify the work through their competent person scheme. Elsewhere in the UK, the process differs, so confirm the local route before work begins.
What certificate should I receive?keyboard_arrow_down
Ask for an Electrical Installation Certificate for the completed replacement, with the test results and details of any limitations, plus the relevant Building Regulations compliance record. Keep these with your property documents. A consumer-unit certificate is not automatically a full EICR.
Why might the price increase after the electrician arrives?keyboard_arrow_down
Testing can uncover faults, inadequate earthing or bonding, damaged cables, or circuits that need investigation before reconnection. Access and circuit count can also differ from the information used for the estimate. Agree rates and approval for extra work in writing before the job starts.
Should I choose RCBO protection or a dual-RCD board?keyboard_arrow_down
The suitable arrangement depends on the installation and the electrician's design. Individual RCBOs can limit the effect of a fault to one circuit, while other compliant designs may cost less. Ask the electrician to explain the options, applicable requirements and price difference for your home.
Can I keep using electricity during the replacement?keyboard_arrow_down
Usually not while the old unit is disconnected and circuits are being tested. The electrician will tell you when the supply is isolated and restored. Plan for appliances and equipment that need power, and do not try to reconnect anything yourself.
Find electricians near you
From typing your business name to your first enquiry, here is the route.
More electricians cost guides
From typing your business name to your first enquiry, here is the route.
Price references, safety and legal guidance
From typing your business name to your first enquiry, here is the route.